NASA tested RS-25 engine No. 10001 on November 18 at the Fred Hayes Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. The 200-second hot-fire test of the development engine is intended to provide NASA and prime contractor L3Harris Technologies with data that could improve RS-25 performance and reliability for future Artemis missions.
Test supports future Artemis missions
The test team planned to operate the engine for 3 minutes and 20 seconds. Although this development engine will not fly, its high-temperature combustion test will allow engineers to collect critical data on the engine’s performance and operation.
For the 2028 Artemis IV Moon landing mission, a Space Launch System (SLS) rocket will launch astronauts aboard the Orion spacecraft from NASA’s Kennedy Space Center in Florida. The mission is part of NASA’s broader effort to explore the Moon’s south pole, establish a permanent human presence on the lunar surface, and lay the groundwork for the agency’s first crewed mission to Mars.
RS-25 engines power the SLS
Each Artemis mission uses four RS-25 engines, which together generate up to 2 million pounds of thrust to support the SLS launch.
NASA tests and certifies every RS-25 engine at NASA Stennis before it is cleared for flight. Operators from NASA, L3Harris, and Nova Space Solutions conducted the test.
Source: www.nasa.gov


